October 21 2018 / Rating: 8.9 / Views: 160
Rss

Lean case studies manufacturing - Case Study How Lean Failed

The employees learned to eliminate many redundant tools and procedures from their processes. We constructed work instructions, both visual and written, along with standardized maintenance routines of the machines in the CNC area.


Harley is well-known for the feelings it evokes in its customer base, and the H-D culture is an unavoidable teaching case in any marketing course.

The data for this study were obtained through interviews, questionnaire survey and archival sources. Having a strong background in continuous improvement, naturally I was delighted at the prospect of working with him. The video below featuring Dwayne Kirk from the, explains the process and the results achieved. doi Stump B, Badurdeen F 2009 Integrating lean and other strategies for mass customization manufacturing a case study.

Case Study 1 New Balance If you ve ever walked into a JC Penney or Kohl s shoe department, you ve seen the New Balance brand.


Only a very small fraction of our client success stories are summarized below. On my flight from Oslo to Rome this weekend, I was asked to sit in the cockpit. Increased Productivity by 20, Reduced floor space requirements by 43 Sector Manufacturing- Metal Fabrication Turnover 3m Staff 57 Major Issues Profit reducing, supplier and energy price increase, customers will not accept price increase, over stocked, quality standards dropped, poor morale, lead times too long Results Increased Productivity by 200, Reduced lead times by 86 Sector Manufacturing- Security Products Turnover 1m Staff 12 Major Issues Poor profit margin, Poor management controls, High number of quality failures, Productivity very low, Poor staff morale, Untidy factory causing risk to health and safety Results Increased Productivity by 89, Reduced stock levels by 51 Sector Manufacturing- Wood Machining Turnover 4m Staff 52 Major Issues Output compared to capacity is low, 3 shifts running 24 hours only just coping with demand, poor staff morale, regular machine breakdowns, increasing costs due to energy prices Results Increased uptime and reduced number of shifts from 3 to 2 Futurestate Solutions Ltd. 5 part KanBans between operations emerged, later becoming 1 piece between assemblers and operators. Focused Factory Manufacturing Strategy How Apple Computer bungled strategy in their 1984 Factory of The Future and how they and their partner, Foxconn, are enjoying great success today. doi Eisenhardt KM 1989 Building theories from case study research. Low-volume, High-mix Manufacturing Tool and Die Learn how Thrustmaster of Texas successfully adopted lean thinking and practices to make sustainable improvements in a short period of time, and how other manufacturers of highly engineered, low-volume products can follow their lead using the Lean Transformation Framework. A macro view of your operation coupled with effective engagement of staff can yield hundreds of thousands of dollar savings. Vative s hands on approach to business improvement is perfectly suited to on farm processes.

I could have written a highly detailed book about the struggles at XCorp, but this chapter is sufficient to show how easily an attempt at lean implementation can fall apart because of poor management commitment. Due to the nature of the equipment, we also relied heavily on and ergonomic tools to properly stage needed items and reduce risk of injury and operator fatigue.

We put a great deal of effort into training and obtaining commitments from senior management and all other staff to continue the improvement process long after we are no longer serving the clients on a regular basis.


The line used only seven carts, which moved single piece flow through the six workstations and left no room for WIP.


Lean Solutions We worked with the machine operators, both highly skilled and new to machining, to begin using the tools of TPM Total Productive Maintenance.

Manufacturers have seen major gains in revenue and profits. This was a productivity improvement of more than 4x. track your view or change your orders in Delivery and Returns see our? Although the teams had made mistakes, as all kaizen teams do, they had worked hard and were very flexible.


People analytics is not a substitute for strategy or critical thinking. Naval Ship Repair Facility and Japan Regional Maintenance Center, used a series of kaizen events to shorten service lead time by 68 percent.


Lean production- Jaguar Jaguar case studies and information Business Case Studies Page 1 This case study focuses on the way in which Jaguar, one of the world s most prestigious car manufacturers, has employed lean manufacturing processes. In 2012 it has more than 17,000 stores in 55 countries. After the Blitz, the new cell, using only 4 assemblers, was capable of producing one unit every 15 minutes, 4 per hour, or 32 units per day, with 99 perfect quality!


He thus announced in early 1991 that he planned to retire and then led the search for his replacement. If you are a seller for this product, would you like to? Kahiki Foods is an expanding, family-run Asian foods manufacturer with about 200 employees in Gahanna, Ohio, USA. Lean Solutions The initial meeting with the management team was spent identifying some of the real root cause issues. Sometimes, even the terminology is confusing, including a phrase in the.


For instant access to more exclusive content, just click the previews below. The company had simply started poorly, and as the senior lean engineer, I needed to recharge and get back on the horse. 30 Reduction in Manhours Land Rig Manufacturer reduces manhours by 30, build duration by 24 with commensurate cost reduction as a result of Lean Manufacturing Your recently viewed items and featured After viewing product detail pages, look here to find an easy way to navigate back to pages you are interested in. Industrial Engineering Federal University of S o Carlos S o Carlos Brazil About this article Cite this article as G mez P.

The initial efforts focused on the ERP planning process. This improvement negated any need to purchase equipment to meet forecasted demand.


Summary We helped these and many other clients achieve fantastic improvements in their operations. The 1065 line was to be supervised by someone who had no lean background and had not been trained to manage this type of a process. In December of 2008, Kahiki began receiving extra-strength surcharges from the City of Columbus division of Public utilities for its water quality. He scheduled a meeting for late February to discuss the schedule for the year with upper management., employs more than 2,100 people and operates facilities throughout the United States and Canada.

Conducted well over 200 treasure hunts globally with a combined emissions reduction of over 250,000 metric tons of GHGs. Steel Mill Tin Plate Problems This large division of a vertically integrated steel mill had been losing money for several years. Goals were set to gradually move toward a 50 50 balance of the day and night shifts. The line lead did not make people accountable, the supervisor was rarely available to advise the line lead, and the production manager was never involved. We would start putting up the visual markings and designations the next day. Our editor spoke with John Shook on a Shinkansen platform after four days in Toyota City and Nagoya. The teams were asked to arrive early on Friday morning to begin assembling their reports. Reducing Patient onboarding with Digital Transformation This Operational Excellence project is a fantastic example of a business identifying the problems caused by traditional ways of working, and solving them by deploying digital technologies and operational excellence methodologies to transform operations. The engineer and I worked every day, updating the work instructions. NBC Universal, which is 80 owned by GE, is one of the world s leading entertainment companies and is involved in the development, production and marketing of various entertainment ventures throughout the world. Downloads You can download resources for this case study below- 2. But more than this, the approach taken in this book gives readers the tools to effectively apply Lean techniques.

Following the Go and See rule they learned early in these workshops, Skier s Choice took benchmarking trips to companies considered world class in many performance areas. Chapter 2 describes the strategic purpose of lean manufacturing and explains why it is critical to establish key shop floor metrics. Lean Solutions Recognizing the importance of locating the NDT area near its internal feeders, we located a centrally located space that would sufficiently meet the needs of the NDT area.


No apparent sequencing or organisation of molds in the pouring area.


Gear Technol 26 27 Corbett L, Campbell-Hunt C 2002 Grappling with a gusher! The company was faced with a series of extreme situations at the same time- the September 11th attacks, a national change in the feelings towards buying weapons and specifically sports knives, and an increase in the cost of doing business in California- that shattered the company s original way of meeting customer demand and forced them to adopt a new way of doing business that could endure these changes. Productivity Press, Portland Godinho Filho M, Saes EV 2013 From time-based competition TBC to quick response manufacturing QRM the evolution of research aimed at lead time reduction.

In September, Vipro ceremoniously opened their new facilities. Implementing was another important part of the solution.


We facilitated this process with members present from both day and swing shift. For Buck Knives, Lean came at a turning point for the company. They demonstrate when and how to deviate from the academic approach. Dealing with any change is difficult, and, unfortunately, there is no perfect template to use as a guide.

A relatively quick, intensive project accelerates the rate of improvement and creates a showcase facility for spreading lean concepts.


Industry Engineered Plastic Products Comprehensive multi-location intervention focusing on value stream restructuring, cell formation, labour balancing direct and indirect, improving production cell design, rapid changeover, elimination of capital expenditure needs, introduction of visual controls and energy savings. Wayne, Indiana by Mayor Graham Richard who used this technology to initiate improvements in a number of different departments such as fire, community development, water pollution control, right of way, street, engineering services and solid waste.

Tags: #case, #case manufacturing


Random essay: